Project Spotlight
Rocket Transfer Lofts
Gyp-Crete 2000®/3.2K, Maxxon
® Reinforcement
and Acousti-Mat
® 3
Location:
Des Moines, IA |
Scope:
- EPS foam and Maxxon Reinforcement were used to remove up to an 8" slope, with Gyp-Crete 2000/3.2K leveling the entire floor prior to wall framing. Acousti-Mat 3 and Maxxon Reinforcement were installed after drywall and topped with 1½" of Gyp-Crete 2000/3.2K.
Total project was 60,000 sq. ft.
|
Maxxon
Dealer:
Skold Construction Services
Des Moines, IA
|
Architect:
Shiffler and Associates
Des Moines, IA
|
General
Contractor:
Hubbell Construction Services
Des Moines, IA |
Overview: In this renovation, Skold Construction Services first utilized EPS board and Gyp-Crete 2000
®/3.2K to remove up to 8" of floor slope prior to wall framing. Acousti-Mat
® 3 and Maxxon
® Reinforcement were selected for superior sound control in the open beam construction. The sound mat and reinforcement were then topped with Gyp-Crete 2000/3.2K to prepare the floor for finished floor goods.