Project Spotlight

Rocket Transfer Lofts

Gyp-Crete 2000®/3.2K, Maxxon® Reinforcement and Acousti-Mat® 3

Location: 
Des Moines, IA
Scope:
  • EPS foam and Maxxon Reinforcement were used to remove up to an 8" slope, with Gyp-Crete 2000/3.2K leveling the entire floor prior to wall framing. Acousti-Mat 3 and Maxxon Reinforcement were installed after drywall and topped with 1½" of Gyp-Crete 2000/3.2K.
    Total project was 60,000 sq. ft.

 

Maxxon Dealer:

Skold Construction Services
Des Moines, IA

Architect:
Shiffler and Associates
Des Moines, IA
General Contractor:
Hubbell Construction Services
Des Moines, IA
Overview: In this renovation, Skold Construction Services first utilized EPS board and Gyp-Crete 2000®/3.2K to remove up to 8" of floor slope prior to wall framing. Acousti-Mat® 3 and Maxxon® Reinforcement were selected for superior sound control in the open beam construction. The sound mat and reinforcement were then topped with Gyp-Crete 2000/3.2K to prepare the floor for finished floor goods.