Project Spotlight

Lutheran High School

Dura-Cap® over Acousti-Mat® II

Location: 
Orange, CA
Scope:
  • Over 8,000 Sq. Ft. of 1 1/4" Dura-Cap®; plus 10,000 sq. ft. of 1"
    Dura-Cap over Acousti-Mat® II, all over a Plywood subfloor.
Architect:
Architects Orange
Orange, CA
Maxxon Dealer:

Maxim Floor Systems
Anaheim, CA

General Contractor:
Thorpe Construction, Inc.
Anaheim, CA

Overview: When the architect, general contractor, and construction management team for Lutheran High School were looking for an upgraded floor/ceiling assembly, they contacted their local Maxxon representative from Maxim Floor Systems.

The construction team needed a 1 hour fire rating and a system that would stop the foot traffic and chair scraping noises of the students on the second floor from transmitting to the offices below.

The representative recommended the Acousti-Mat II Sound Control System with high strength Dura-Cap Floor Underlayment, which was specified and installed on the project.