EarthLink Internet Service Provider
Dura-Cap®
Location:
Pasadena, CA |
Scope:
- 55,000 sq, ft, of 1 1/4" - 1 1/2" Dura-Cap; of which 25,000 square feet included Maxxon Moistop and metal lath.
|
Maxxon
Dealer:
Cell-Crete Corporation |
General
Contractor:
DPR
Irvine, CA |
Overview: The General Contractor for this re-flooring project was looking for a company that could provide a turnkey job, plus do all the work during off hours. A competitive floor underlayment had already been replaced on two occasions.
It was critical to protect all computer equipment in Earthlink's "nerve center", located in the work area. In fact, they wanted Cell-Crete to come in and drape plastic over the computer rack towers before the pour date.
The issue was addressed from the second floor area instead, using Maxxon's Moistop and metal lath topped with Dura-Cap. This solution saved time and eliminated the risk of damaging EarthLink's equipment.
 |
|
 |
Installation of Maxxon Moistop |
|
Dura-Cap installation over Moistop |
| |
|
|
 |
|
 |
Cold joint showing cross section of Moistop, lath and Dura-Cap
|
|
A zero-defects Dura-Cap floor system
|
|