Level-Right®
Level-Right® Cementitious Underlayments can level any floor challenge.

Project Spotlight

Coeur d'Alene Tribal Resort Casino
Dura-Cap®, Gyp-Crete 2000®/3.2K and Acousti-Mat® II

Location: 
Worley, ID

Scope: 

  • 25,000 sq ft of Dura-Cap poured 2 1/4" thick over concrete slab
  • 3,000 sq ft of Dura-Cap poured 1 1/2" thick over metal pan decking
  • 44,000 sq ft of Acousti-Mat II throughout tile areas with Gyp-Crete 2000/3.2K poured 1 1/2" thick over sound mat

 

Maxxon Dealer:

Moser Inc.
Spokane, WA

General Contractor:
HFLK Joint Venture
(Hartanov Fuller General Contractors Inc.
and Leone & Keeble Inc.)
 
Overview: The project, which broke ground in June of 2009, will add two new four-story buildings and nearly 100 opulent hotel rooms. The resort will now be home to
300 rooms overall. Dura-Cap provided the correct floor heights needed in areas of the first and second floors over concrete and metal pan decking.

   

Coeur d'Alene Tribal Resort Casino

 

Acousti-Mat II installed

 

The new LEED Certified Coeur d'Alene Tribal Resort utilizes
Acousti-Mat II with Gyp-Crete 2000/3.2K on the third and
fourth levels over wood subfloor.

   

Gyp-Crete 2000/3.2K screeded to a smooth finish

 

With the Gyp-Crete finished, light trade work will resume within four hours

 

Dura-Cap is installed on top of steel decking.


Maxxon provides underlayment, Gyp-Crete, gypsum concrete and other flooring underlayment products for new construction, remodeling and renovation.
This site and all contents copyright © 2001-2012 MAXXON Inc. All rights reserved.