Project Spotlight

The Torbati Building

Dura-Cap®

Location: 
San Diego, CA
Scope:
  • 14 Stories
  • 21 units per floor
  • 400 bags of Dura-Cap per floor
  • Total of 5,600 bags of Dura-Cap
  • Poured at depths ranging from 1/4" to 3/4"

 

Maxxon Dealer:

Dedicated Floor Systems
Escondido, CA

Contractor:
Reno Contracting
San Diego, CA

Architect:
Mark W. Steel
San Diego, CA

Overview: The historic 14 story Torbati Building has been a fixture on the edge of San Diego's Gaslamp Quarter since the mid 1920's. The former office building, which once housed Home Federal Bank, is being renovated and converted into high-end, luxury apartments.

Dedicated Floor Systems was brought in as the leveling experts of Southern California. In order to meet the extremely tight floor tolerance of 1/8 in 6", the team at Dedicated Floor Systems applied Maxxon's Dura-Cap at depths ranging from 1/4" to 3/4". Dura-Cap is formulated to cap and flatten rough, pitted, cracked and out-of-level concrete. The application ensured that the floor coverings installers had a level surface ready and in time for the installation of Luxury Vinyl Plank.


     

 

 

 

Torbati5   Torbati6    

Torbati7

 

Torbati8